Study on the Calculation of the Post-construction Settlement after the Secondary Preloading of Sand Pile Composite Foundation of the High-speed Railway
To complete the technology upgrade of the Kunshan section of the Beijing-Shanghai Railway, the secondary preloading of the original sand pile foundation was carried out in five years after the completion of the railway.Whether the control requirements of the post-construction settlement of the upgraded railway could Watch Cases be met was the key.T